SPC Tools 한국어

Guides · Reference

Cpk to PPM and sigma level conversion table

Cpk tells you how many standard deviations fit between the process mean and the nearest specification limit, in units of three: Cpk = Z / 3. Assuming a normal distribution, that distance converts directly into the expected fraction of parts outside the limit.

CpkZPPM one sidePPM both sides (centered)Yield (centered)Sigma level*
0.331.0σ158,655317,31168.2689%2.5
0.501.5σ66,807133,61486.6386%3.0
0.672.0σ22,75045,50095.45%3.5
0.832.5σ6,21012,41998.7581%4.0
1.003.0σ1,3502,70099.73%4.5
1.103.3σ48396799.9033%4.8
1.203.6σ15931899.9682%5.1
1.334.0σ31.763.399.9937%5.5
1.504.5σ3.46.899.99932%6.0
1.675.0σ0.290.5799.999943%6.5
1.835.5σ0.020.0499.9999962%7.0
2.006.0σ0.0010.00299.9999998%7.5

Z = distance from the mean to the nearest limit in standard deviations (3 × Cpk). "Centered" columns assume the mean sits in the middle of a two-sided tolerance (Cp = Cpk). Cpk values 0.33, 0.67, 1.33, 1.67 and 1.83 are exact thirds (1.33 = 4σ, 1.67 = 5σ). The same table applies to Ppk, with overall instead of within sigma. * Sigma level as used in Six Sigma = 3 × Cpk + 1.5 (see below).

How to read it

What about Six Sigma's 3.4 defects per million?

Six Sigma assumes the mean drifts by about 1.5σ over the long term, and quotes the sigma level of the short-term process. A "6σ process" therefore has 6 − 1.5 = 4.5σ to the nearest limit in the long run — that is Cpk 1.5 and 3.4 PPM. That is why the last column is 3 × Cpk + 1.5. The 1.5σ shift is a convention, not a law; for your own process, measure Ppk over a long enough period instead of assuming it.

Caveats

Get Cpk and expected PPM from your data

The free calculator reports Cp, Cpk, Pp, Ppk together with expected and observed PPM, a histogram and a control chart.

Open the free Cpk calculator →

Related guides